0
General Information
- Entire Industrial Park is 3- Phase Current
- Seven of the 12 Cleared Lots are pre-Engineered, shovel Ready!
- Five Lots along FEC Railway with approximately 1100ft of Railroad Frontage
- Sufficient Concurrency for maximum building on each lot with Reserve
- Owners Association set up with Covenants and Restrictions in place and recorded
- Master Retention Ponds for entire park ( three ponds )
- Master St. Johns River Water Management District Permit
- Archaeological Study Completed
- Protected Species Survey Completed
- No Retention ponds necessary on individual lots because of existing Master Retention Ponds
- St. Johns County Water throughout park
- Completed Commercial Grade Infrastructure
- Paved Roads with 2″ Asphalt and 22″ Concrete Curbing throughout park
- Fire Hydrant within 300 ft of each lot meeting Federal fire code
- 1600ft by 6ft concrete block wall on partial park perimeter
- 550ft of 6ft chain link fence on remaining park perimeter
- Electric security Gate to park with keypad Entry and Remote