DAVIS INDUSTRIAL PARK

0

General Information

  • Entire Industrial Park is 3- Phase Current
  • Seven of the 12 Cleared Lots are pre-Engineered, shovel Ready!
  • Five Lots along FEC Railway with approximately 1100ft of Railroad Frontage
  • Sufficient Concurrency for maximum building on each lot with Reserve
  • Owners Association set up with Covenants and Restrictions in place and recorded
  • Master Retention Ponds for entire park ( three ponds )
  • Master St. Johns River Water Management District Permit
  • Archaeological Study Completed
  • Protected Species Survey Completed
  • No Retention ponds necessary on individual lots because of existing Master Retention Ponds
  • St. Johns County Water throughout park
  • Completed Commercial Grade Infrastructure
  • Paved Roads with 2″ Asphalt and 22″ Concrete Curbing throughout park
  • Fire Hydrant within 300 ft of each lot meeting Federal fire code
  • 1600ft by 6ft concrete block wall on partial park perimeter
  • 550ft of 6ft chain link fence on remaining park perimeter
  • Electric security Gate to park with keypad Entry and Remote

 

Leave a Reply

Your email address will not be published / Required fields are marked *